SUPERSTRUCTURE OPERATION
Operating instructions • Semitrailer • 505369471-04 • 02/2019
105
Removing the lath socket
1
3
2
Fig. 6-82:
Adjustable lath socket
1
Lath socket
2
Locking mechanism
3
Double-deck post
► Removing the plug-in lath
► Press back the lock on the lath socket.
► Lift out the lath socket.
ü
The lath socket has been removed
Inserting the lath socket
► Attach the lath socket at the desired
position from above into the grid on the
post.
► Allow the lock on the lath socket to en-
gage.
ü
The lath socket has been inserted.
When all the lath sockets have been
moved, the plug-in laths can be at-
tached.
INFO
The plug-in laths must be aligned hori-
zontally.
6.2.12
Front wall depot
Depending on the version, KRONE trailers
with a steel front wall can be equipped with
a front wall depot.
1
Fig. 6-83:
Front wall depot
1
Front wall depot
The front wall depot contains fixed storage
shelves to store 24 paper wedges
"8.13.1 Using the paper wedge", pg. 164)
, two
pallet rollers,
and various other load se-
curing materials.
Opening the front wall depot
1
Fig. 6-84:
Locks on the front wall depot
1
Locks
► Actuate the locks.
► Fold down the flap.
ü
The front wall depot is open.