
Initial operation
7
Gelenkwelle anpassen [Walterscheid]
7.5
BiG Pack 1290 HDP XC
Original Operating Instructions 150000752_01_en
73
Dismounting outer guard tube
1
2
5
3
4
6
1
7
BP000-394
Use a screwdriver (3) to pull the collar (1) over the locks (4) of the guard funnel (2).
Screw out the 3 screws (5).
Turn the collar (1) until you can feel a stop (6) and push back the outer guard tube (7).
Dismounting inner guard tube
1
2
3
4
BP000-395
Loosen the inner guard tube (1) from the slide ring (3) by lightly tapping the cap (2) and
push it back.
Dismount the seal (4).