
Operation
9
Threading the lower twine (double knotter)
9.7
BiG Pack 1290 HDP XC
Original Operating Instructions 150000752_01_en
103
Connecting twine rolls 2a, 2b, 3c and 2c with each other
Guide the beginning of the twine of twine roll (2a) via the upper blue eye through the twine
brake out of the twine box.
Guide the beginning of the twine of the twine roll (2b) through the blue eye above and
connect it by a reef knot with the end of the twine of twine roll (2a).
Tie the start of the twine from twine roll (2c) in a reef knot to the end of the twine from twine
roll (2b).
Shorten the ends of all reef knots to
x = 15 - 20
mm.
Connecting twine rolls 3a, 3b, and 3c with each other
Guide the beginning of the twine of twine roll (3a) via the green eye above through the twine
brake out of the twine box.
Tie the start of the twine from twine roll (3b) in a reef knot to the end of the twine from twine
roll (3a).
Guide the start of the twine from twine roll (3c) through the green eye above and further to
the next green eye. Then tie it to the end of the twine from twine roll (3b) by a reef knot.
Shorten the ends of all reef knots to
x = 15 - 20 mm
.
9.7
Threading the lower twine (double knotter)
Guiding the lower twine from the twine box to the lower twine guide
BPG000-027
Make sure that the lower twines never cross over each other.
Guide the 3 lower twines (1, 2, 3) coming from the twine box (6) further to the twine guide
(7).
Guide the 3 lower twines (1, 2, 3) from above through the eyes of the twine guide (7) and
then further to the twine guide (8).
Guide the 3 lower twines (1, 2, 3) from the outside through the eyes of the twine guide (8)
and then further to the lower twine brakes.