
Operation
9
Pick-up
9.11
BiG Pack 1270 XC
Original Operating Instructions 150000748_01_en
111
BP000-114
Guide the upper twine from the twine brake (9) through the eye (10) of the tensioning arm
(11).
Pull the upper twine towards the bottom and guide it between the rolls (12) of the upper
needle (13).
Guide the other upper twines such as the first upper twine from the twine brake further to the
upper needle.
Æ
The next and final step for threading the upper twine depends on whether the bale channel
is empty or filled.
If bale channel is empty:
Knot the upper and lower twine in the middle of the bale chamber.
Or
Guide the upper twine under the crossbeam of the knotting table and knot it on the
crossbeam of the upper baling flap.
In order to tension the tensioning arm (11), pull back the upper twine in front of the twine
guide eye (8).
If the bale channel is filled:
Read the actual bale length on the terminal.
If the difference between actual bale length and target bale length is > 50 cm:
Let the loose twine end of the upper twine hang down approx. 50 cm in the bale channel.
The tensioning arm (11) is tensioned when the upper twine is caught in the crop while during
subsequent baling.
If the difference between actual bale length and target bale length is < 50 cm:
Guide the upper twine under the crossbeam of the knotter table and knot it on the
crossbeam of the upper baling flap.
In order to tension the tensioning arm (11), pull back the upper twine in front of the eye (10).
9.11
Pick-up
INFORMATION
Lift the pick-up for driving in the headland or during reverse travel.