background image

 INSTALLATION 

2

9

TIDALFLUX 2300 F

www.krohne.com

06/2013 - 4002489402 - QS TIDALFLUX 2300 R02 en

2.8.8  Mounting position

2.9  Mounting

2.9.1  Mounting grounding rings

CAUTION!

Only install the flow sensor in the shown position to keep the electrodes under water. Limit the 
rotation to 

± 

2

°

 to maintain the accuracy.

Figure 2-13: Mounting position

CAUTION!

In order to get a reliable height measurement it is absolutely necessary

absolutely necessary

absolutely necessary

absolutely necessary that the inner side of the 

connecting pipeline is electrically conductive and connected to ground. If not, tailor-made 
grounding rings with a cylindrical part can be delivered. Please contact your local agency in case 
of doubt.

Figure 2-14: Grounding with grounding rings

1  

Existing pipeline

2  

Grounding rings, custom made to inner diameter of pipeline

3  

TIDALFLUX

4  

Insert the cylindrical part of the grounding ring into the pipeline. Use an appropiate gasket between the grounding ring 

and the flange.

INFORMATION!

Sizes of the grounding rings are diameter dependent and available on request.

Summary of Contents for TIDALFLUX 2300 F

Page 1: ...F TIDALFLUX 2300 F TIDALFLUX 2300 F TIDALFLUX 2300 F Quick Start Quick Start Quick Start Quick Start KROHNE 06 2013 4002489402 QS TIDALFLUX 2300 R02 en The documentation is only complete when used in...

Page 2: ...2 8 8 Mounting position 9 2 9 Mounting 9 2 9 1 Mounting grounding rings 9 2 9 2 Torques and pressures 10 2 9 3 Temperatures 11 3 Electrical connections 12 3 1 Safety instructions 12 3 2 Important not...

Page 3: ...tions can result in damage to the device or to parts of the operator s plant INFORMATION These instructions contain important information for the handling of the device CAUTION Installation assembly s...

Page 4: ...to calculate the amount of fluid running through the pipe 2 3 Nameplates Figure 2 1 Scope of delivery 1 Ordered flowmeter 2 Product documentation 3 Factory calibration report 4 CD ROM with product doc...

Page 5: ...r in pipeline 2 7 General requirements Figure 2 3 Transport INFORMATION The following precautions must be taken to ensure reliable installation Make sure that there is adequate space to the sides Prot...

Page 6: ...S TIDALFLUX 2300 R02 en 2 7 1 Vibration 2 7 2 Magnetic field 2 8 Installation conditions 2 8 1 Inlet and outlet Vibration Figure 2 4 Avoid vibrations Magnetic filed Figure 2 5 Avoid magnetic fields Fi...

Page 7: ...ust be proportional to the size of the flowmeter Figure 2 7 Installation before control valve CAUTION The accuracy is influenced by the slope Stay within 1 to get the most accurate measurements Figure...

Page 8: ...influenced by anything However it is advisable to create a possiblity for cleaning just in front or behind the sensor 2 8 7 Flange deviation Figure 2 10 Open discharge 1 5 DN 2 Make sure that the wat...

Page 9: ...sary absolutely necessary absolutely necessary that the inner side of the connecting pipeline is electrically conductive and connected to ground If not tailor made grounding rings with a cylindrical p...

Page 10: ...ures Tightening of bolts Always tighten the bolts uniformely and in diagonally opposite sequence Do not exceed the maximum torque value Step 1 Apply approx 50 of max torque given in table Step 2 Apply...

Page 11: ...27 138 700 PN 10 24 x M 27 163 800 PN 10 24 x M 30 219 900 PN 10 28 x M 30 205 1000 PN 10 28 x M 35 261 Nominal size inch Flange class lb Bolts Max torque Nm 8 150 8 x 3 4 69 10 150 12 x 7 8 79 12 15...

Page 12: ...out by properly trained specialists INFORMATION Look at the device nameplate to ensure that the device is delivered according to your order Check for the correct supply voltage printed on the nameplat...

Page 13: ...and connection of mains supply will be described on the next pages Figure 3 1 Cable entries for electrical connection 1 View p of the connection box of the signal converter 2 Field current cable 3 Sig...

Page 14: ...l cable Type A DS signal cable Type A DS signal cable maximum length depends on the conductivity of the fluid Field current cable Field current cable Field current cable Field current cable The cross...

Page 15: ...re 3 3 Construction of signal cable B 1 Stranded drain wire for the inner shield 10 1 0 mm2 Cu AWG 17 not insulated bare 2 Insulated wire 2 0 5 mm2 Cu AWG 20 with stranded drain wire 20 of shield 3 In...

Page 16: ...trip the conductor to dimension a 2 Trim the outer shield 60 to dimension b and pull it over the outer sheath 3 Remove the stranded drain wire 6 of the outer shield and the inner shield Make sure not...

Page 17: ...nsion a 2 Trim the outer shield 60 to dimension b and pull it over the outer sheath 3 Remove the stranded drain wire 6 of the outer shield and the shields and stranded drain wires of the insulated con...

Page 18: ...mm 2 Required materials Shielded 2 wire insulated copper cable Insulating tube size according to the cable being used Heat shrinkable tubing DIN 46 228 wire end ferrules size according to the cable be...

Page 19: ...3 x 1 5 mm2 LIYCY cable 1 Strip the conductor to dimension a 2 Trim the outer shield to dimension b and pull it over the outer sheath 3 Crimp the wire end ferrules onto the conductors 1 2 and 3 Connec...

Page 20: ...9 Clamping of shields 1 Field current cable 2 Signal cable Connecting shielding via special cable gland Figure 3 10 Connecting the shield within the cable gland 1 Wires 2 Isolation 3 Shielding 4 Isol...

Page 21: ...electric shocks CAUTION In order to get a reliable height measurement it is absolutely necessary absolutely necessary absolutely necessary absolutely necessary that the inner side of the connecting p...

Page 22: ...89 1 m 265 mm 10 4 n 251 mm 9 9 INFORMATION Detailed 2D and 3D drawings are available on the website of the manufacturer Nominal size Dimensions mm Approx weight kg DN PN a b c d D Di 200 10 350 582 2...

Page 23: ...76 15 7 52 19 0 11 06 145 14 284 27 56 30 22 16 85 9 8 21 0 12 44 210 16 284 31 5 31 13 19 02 9 53 23 5 14 37 255 20 284 31 5 35 21 23 03 11 54 27 5 18 39 320 24 284 31 5 39 50 27 32 13 66 32 0 22 32...

Page 24: ...s products Products and systems for the oil gas industry Measuring systems for the marine industry Head Office KROHNE Messtechnik GmbH Ludwig Krohne Str 5 47058 Duisburg Germany Tel 49 0 203 301 0 Fax...

Reviews: