background image

 

Quick Start

 

 

For initial set up, we strongly recommend that you also refer to the relevant manual! 

 

04/2022 – 4009316501 - QS SMARTPAT ORP R01 en 

 

 

SMARTPAT ORP 
Digital sensors for ORP measurement

 

Connecting the cable to the sensor  

For connection use only a VarioPin cable with shield wire, like the cable VP2-S. 

 

 

 

 

 

 

 

 Ensure that both cable and sensor connector are absolutely dry 

 Screw the cable connector on the sensor connector and tighten it by hand 

Cable VP2-S 

Transparent-black (inner coax shield) 

Ub+ 

White 

Ub- 

Shield 

Connection to junction box SJB 200 W(-Ex) 

 

 

 

 

 

 

 

 

 

 SJB 200 W(-Ex) junction box, connection with or without internal resistor 

 Sensor with VP2-S cable 

 Display or other 4...20 mA loop powered device (e.g. data logger) 

 

Control system without 250 Ω resistor connected to internal resistor of SJB 200 W

(-Ex) 

 Control sys

tem with 250 Ω resistor connected to SJB 200 W

(-Ex) without using internal resistor 

SJB 200 W-(Ex) with internal resistor 

SJB 200 W-(Ex) without internal resistor 

Shield 

Shield 

 

 

Sensor - 

Sensor - 

Loop - w/o Display 

Display - 

Loop + 

Loop - w/ Display 

 

 

Loop + (250

 

 

 
 

 

 

Installation, assembly, start-

up and maintenance may only be performed by appropriately trained personnel.

 

Check the nameplate for correct operating conditions.

 

 

For use in hazardous areas, special codes and regulations are applicable. Instruments must not be 

connected to power supply before reading instructions described in the supplementary manual.

 

 

The responsibility as to the suitability, intended use and corrosion resistance of the used materials of this 

device 

against the measured fluid 

rests solely with the operator. 

 

SMARTPAT ORP 

sensors are factory calibrated. Nevertheless it is recommended to calibrate the sensor 

before installing it into its final measuring location. 

 

1.  

Connect the sensor to a device suitable for SMARTPAT 

ORP sensor calibration: OPTIBRIDGE / PC,   

SMARTMAC, HART handheld, or your PLC. 
2.  Calibrate the sensor. 

3.  Install the sensor into its final measuring location.

 

1 Unpacking the sensor

 

 

Remove the protective cap from the sensor tip by gently twisting and pulling it

 

• Lay the sensor on a soft ESD mat or soft paper tissue 

• Leave the protection cap 

 on the VP connector, as long as the sensor is not connected to the cable. 

 

 
 
 
 
 
 
 
 
 
 
 
 
 

2 Electrical connection 

 

 

 

 
 
 

 

 

Danger: 

All work on the electrical connections may only be carried out with the power disconnected. 

Take note of the voltage data on the nameplate.

 

Observe the national regulations for electrical installations.

 

 

 

 

 

 

 

Reviews: