![KROHNE SHD 200 Quick Start Download Page 1](http://html1.mh-extra.com/html/krohne/shd-200/shd-200_quick-start_2004168001.webp)
Quick Start
For initial set up, we strongly recommend the use of the relevant manuals in addition!
11/2019 – 4007946801 - QS SHD 200 R01 en
1
SHD 200
Control unit for 4
…
20 mA/HART
®
field devices
2 Electrical connection
Terminal designation
Terminal assignments
J
Loop2+
K
Loop2-
FE
Functional earth
S
Shield
A1
B1
Sensor-
A2
HART+
B2
HART-
C
Loop1+ (HART
®
resistor on board)
D
Loop1+ (external HART
®
resistor)
E
Loop1-
F
G
Relay1-
H
I
Relay2-
Installation, assembly, start-up and maintenance may only be performed by appropriately
trained personnel.
For use in hazardous areas, special codes and regulations are applicable which are supplied in
a separate document that describes all hazardous area relevant information.
The responsibility as to the suitability, intended use and corrosion resistance of the used
materials against the measured fluid of this device rests solely with the operator.
For complete documentation (manuals, supplementary manuals, data sheets and certificates)
please refer to
www.krohne.com/Downloads
.
1 Installation
1.
Mark the holes with a suitable pen 1.
2.
Drill the 4 holes and fasten the device securely to the wall 2
2
1