Turn the table top right side up, 

making sure the table tracks do not fall 

out and get damaged. 

(5) 

Lift the table tracks out of the table-

top slots. Leave the table-track bolts 

and plastic retaining plates in place. 

(6)

 Mark the table frame member 

adjacent to the side of the table with 

the saw kerf (cutting side). 

(7) 

Remove the 16 screws securing 

the table top to the aluminum frame 

using the included star-drive bit and 

remove the top. Discard the screws.

(1) 

Position the new table top in the 

aluminum frame with the cutting side 

of the top on the side opposite the 

mark on the frame.

ATTENTION

:

!

 Rotating the new table top 180° 

from the position of the old top avoids driving the new 

table-top bolts into the aluminum frame at the same 

locations where the old bolts were removed,  

ensuring secure anchorage.

(2)

 Drive the 16 new table-top screws 

to attach the new table top to the 

aluminum frame.

(3) 

Position the table tracks in the slots.

ATTENTION

:

!

 Different bolt spacing allows the 

table tracks to be installed only in one orientation.

SETUP

Remove the old Project Table Top

Installing the Project Table Top

7

6

5

4

Retaining Plates

Mark

Saw Kerf

3

2

1

Saw Kerf

Mark

Summary of Contents for Adaptive Cutting System Project Table Kit

Page 1: ...ADAPTIVE SYSTEM 01 2019 NK9396 V1 Owner s Manual Guide d utilisation Manual del propietario PROJECT TABLE REPLACEMENT TOP IS COVERED IN THIS MANUAL ...

Page 2: ...inalAdaptive Cutting System Project Table owner s manual for part identification and reassembly instructions CONTENTS ACS745 ITEM DESCRIPTION QUANTITY Project Table Top 1 Table Top Screws 16 Star Drive Bit 1 WARNING This product can expose you to chemicals including Formaldehyde which is known to the State of California to cause cancer For more information go to www P65Warnings ca gov ...

Page 3: ...rt the table tracks when the nuts securing them to the table top are removed ATTENTION Two people are required to lift the Project Table 3 Remove all nuts bar brackets and U bolts fastening leg assemblies 1 and 2 the wheel assembly and the four nuts attaching the table tracks to the Project Table top Retain all nuts bar brackets and U bolts for reassembly Remove the old Project Table Top 1 1 2 3 3...

Page 4: ... top in the aluminum frame with the cutting side of the top on the side opposite the mark on the frame ATTENTION Rotating the new table top 180 from the position of the old top avoids driving the new table top bolts into the aluminum frame at the same locations where the old bolts were removed ensuring secure anchorage 2 Drive the 16 new table top screws to attach the new table top to the aluminum...

Page 5: ...le top edge 3 Install leg assemblies 1 and 2 and the wheel assembly as instructed in your original Adaptive Cutting System Project Table owner s manual 1 Turn the Project Table right side up and install the hinge mounting plates hinges and guide track and recalibrate your system as instructed in your original Adaptive Cutting System Project Table owner s manual ATTENTION Two people are required to...

Page 6: ...ducts and support that serve your needs better CUÉNTENOS SOBRE SU EXPERIENCIA SU OPINIÓN CUENTA Siempre trabajamos para mejorar los productos Kreg y su satisfacción con ellos para que tenga excelentes experiencias de construcción de proyectos Puede ayudar compartiendo su retroalimentación en www kregtool com feedback Solo toma un par de minutos y nos estará ayudando a crear productos y brindar un ...

Reviews: