___________
Date
Performed by________________________
Stamp/signature
___________
Date
Performed by________________________
Stamp/signature
Inspection log
1st Inspection
Performed by
Kränzle as per the inspection record supplied with the
machine
2nd Inspection
6th Inspection
5th Inspection
___________
Date
Performed by________________________
Stamp/signature
4th Inspection
___________
Date
Performed by________________________
Stamp/signature
3rd Inspection
Summary of Contents for therm 1165
Page 23: ...223232323 23 Cockpit terminal plan...
Page 28: ...28 Complete assembly...
Page 30: ...30 Switchbox electronics...
Page 34: ...34 Heat exchanger...
Page 38: ...38 Connections...
Page 40: ...40 Transmission unit...
Page 46: ...46 Hose drum Special accessory Supplementary Parts 44 152...
Page 48: ...NOTES 48...