![KRAL BEM 300 Series Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/kral/bem-300-series/bem-300-series_operating-instructions-manual_2000350021.webp)
Operating Instructions
OIE 15en Edition 2019-12 HW 2.0/SW 2.0
21
Connecting cables
Electrical connection
Connecting cables to the tension spring
terminals
Prerequisite:
□
Cable shortened to correct length
□
All wires stripped to approx. 5 mm
Aids
□
KRAL tool set
□
Diagonal cutter
1. Remove the rear device cover and remove
the terminating tool.
2. Use the diagonal cutter to adapt the cable
gland to the cable diameter.
3. Pull the cable through the cable gland.
4. Hook the short spike of the terminal tool in the
tension spring terminal. Press the terminal
tool from the cable opening.
The tension spring terminal is released.
5. Introduce the wire into the cable opening.
6. Remove the terminal tool.
7. Repeat Steps 4 to 6 for all the wires.
8. Replace the rear device cover.
Summary of Contents for BEM 300 Series
Page 1: ...Operating Instructions KRAL Electronics BEM 300 Series OIE 15en Edition 2019 12 HW 2 0 SW 2 0 ...
Page 45: ...Operating Instructions OIE 15en Edition 2019 12 HW 2 0 SW 2 0 45 Notes Appendix Notes ...
Page 46: ...46 OIE 15en Edition 2019 12 HW 2 0 SW 2 0 Operating Instructions Notes Appendix Notes ...
Page 47: ...Operating Instructions OIE 15en Edition 2019 12 HW 2 0 SW 2 0 47 Notes Appendix Notes ...
Page 48: ...www kral at KRAL GmbH 6890 Lustenau Austria Tel 43 5577 86644 0 E Mail kral kral at ...