background image

Assembly Manual

12‘x20’ Alexander hardtop gazebo

      with double roof

 

Kozyard LLC Products

 

© 

Copyright 2016 - 2019  Kozyard LLC. | All Rights Reserved.

Summary of Contents for 12'x20' Alexander hardtop gazebo with double roof

Page 1: ...Assembly Manual 12 x20 Alexander hardtop gazebo with double roof Kozyard LLC Products Copyright 2016 2019 Kozyard LLC All Rights Reserved...

Page 2: ...use a drill 2 You will need one or more stepladders 5 Use the hex keys in the box 2 1 Two or more people are required for assembly 7 Do not fully tighten screws prior to complete assembly 15cm 5 9 30...

Page 3: ...TION Pole 4 2 4 4 2 2 4 4 2 2 2 2 2 2 2 6 2 4 6 4 4 4 1 1 6 Pole Beam Jointer Bar Jointer Bar Sidewall Track Jointer Bar Jointer Bar Sidewall Track Beam Beam Joint Bar Jointer Bar Union Bar Corner Cov...

Page 4: ...2 2 4 4 4 4 8 8 N N1 N2 P P1 Q1 Q2 Q3 Q4 R T T1 T2 U1 U2 U3 U5 U4 R1 DESCRIPTION Corner Roof Bar Roof Bar Roof Bar Roof Bar Net Frame Net Frame Net Frame Finishing End Finishing Bar Finishing Bar Fini...

Page 5: ...1 9 x28 2 10 x4 1 11 x12 1 Y1 x2 Ya x4 Y1a x2 X2 x2 X3 x2 X4 x2 X5 x2 X6 x2 X7 x2 X8 x2 X9 x2 X10 x2 X11 x2 X12 x2 W2 x2 W3 x2 W4 x2 W5 x2 W6 x2 W7 x2 W8 x2 V2 x2 V3 x2 V4 x2 V x8 V5 x2 V6 x2 S x160 M...

Page 6: ...A x4 L1 x2 1 x20 L x4 B x2 A A B L L L1 L1 1 1 1 1 1 1 1 A1 Parts Required Step 1 Set up Poles Part A Part B with stand plates Part L Part L1 using screws 1 as shown in diagram page 4 X4 X2...

Page 7: ...C D C F 1 1 1 1 1 1 Parts Required Step 2 Connect Part C Part D into one beam using union bar Part F with screws 1 Connect parts C2 D2 to the finished beam C D using screws 1 as shown in diagram Atta...

Page 8: ...Connect parts D1 C1 E1a E1b to the finished beam D E C using screws 1 as shown in diagram Attach Parts D3 E2a E2b C3 to finished beam D E C using screws 1 page 6 X4 C E D D3 x2 E x2 C3 x2 E1a x2 E1b x...

Page 9: ...2 x28 3 x16 3 3 3 3 2 2 2 2 B A E Parts Required Step 4 Use Screws 2 3 to connect poles and beams together as shown in diagram page 7 X4 X4 X2 A A A A B B C C C C D D D D E E...

Page 10: ...page 8 Parts Required with silicone rubber to seal after finishing the assembly it will be better for no water leaking in heavy rain Reminder X4 AA...

Page 11: ...J2 x4 J1 x4 1 x32 1 1 1 J1 J2 Parts Required Step 5 Affix the frame with corner solidifying bars Parts J1 J2 using screws 1 as shown in diagram page 8 J1 J2 J1 J2 J1 J2 J1 J2...

Page 12: ...ms using corner bycorner cover Part G and screws 9 as shown in diagram Affix middle beams using joint cover Part H and screws 9 and 8 as shown in diagram page 9 X4 X6 If with glass cement to seal afte...

Page 13: ...art C1 and 5 hooks to each slot sidewall track Part E1b Put 7 hooks to each slot of sidewall track Part D1 and 5 hooks to each slot sidewall track Part E1a Step 7 page 10 After finish hooks into track...

Page 14: ...roof bar Part N N1 N2 using screws1 as shown in diagram Attach corner roof bar Part M and roof bar Part N2 N N1 to main frame using screw 1 as shown in diagram page 11 X4 M M M C D C A X2 A X4 X2 B C...

Page 15: ...6 Parts Required Step 9 Attach finishing bar Part P Q1 Q2 with finishing end Part R using screws 1 to corner roof bar Part M as shown in diagram Affix finishing bar Part Q1 Q2 to roof bars Part N N1 N...

Page 16: ...11 x12 Q3 x2 Q4 x2 P1 P1 Q3 Q4 Q4 Q3 P1 1 11 11 Q3 Q4 Q3 Q4 1 1 11 11 11 11 1 1 Parts Required Step 10 Attach net frame Part P1 Q3 Q4 to finishing bar Part Q1 Q2 P using screws 11 1 as shown in diagr...

Page 17: ...K1 x1 K K1 1 1 1 K1 Parts Required Step 11 Connect outside roof connctor Part K1 to inside roof Part K using screws 1 as shown in diagram page 14...

Page 18: ...Parts Required Step 12 Cover metal brackets Part Z Z1 Z2 Z3 Z4 to roof panels as shown in the diagram page 15...

Page 19: ...T R 1 R R R R1 1 1 1 R 1 T1 T2 1 R1 T T1 T2 1 R 1 1 1 R1 1 V1 V2 V3 V4 V V V V V5 V6 Parts Required Step 13 Push the roof panels Part V V1 V2 V3 V4 to upper roof as shown in diagram Attach upper roof...

Page 20: ...shown in diagram Affix solidifying bars to corner bar using iron angle Part U3 and screw 1 as shown in diagram Step 14 page 17 X4 X6 X2 U5 U5 U4 1 1 1 U5 U5 3 3 3 3 5 1 5 1 Attention Connect the U5 ba...

Page 21: ...Parts Required Step 15 Cover metal bracket Part Z to roof panels as shown in diagram page 18 W4 x2 W3 x2 W2 x2 W1 x2 W5 x2 W6 x2 W7 x2 W8 x2 Z x32 W2 W3 W6 W7...

Page 22: ...equired Step 16 Cover metal brackets Part Z Z2 Z1 to roof panels as shown in diagram page 19 X4 x2 X3 x2 X6 x2 X5 x2 X2 x2 X1 x2 X7 x2 X8 x2 X9 x2 X10 x2 X11 x2 X12 x2 Z x28 Z1 x2 Z2 x2 X4 X3 X11 X6 X...

Page 23: ...W6 W7 W8 X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 X1 X2 X3 X4 X5 X6 X7 X8 X9 X10 X11 X12 W1 W2 W3 W4 W5 W6 W7 W8 Overall roof assembly page 20 Connect roof as below Please put the panels on the frame an...

Page 24: ...of panels using screws and spacers Part S as shown in diagram Attention Put on one roof panel and fasten it accordingly before attaching second roof panel page 21 X4 X8 X48 X100 S x160 5 x100 6 x8 7 x...

Page 25: ...Parts Required Step 18 1 Put on mosquito sidewalls and solid sidewalls as shown in diagram page 22 4 Y1 x2 Y x4 Y1a x2 Ya x4 Ya Y1a Y Y1...

Page 26: ...23 When you close the curtain please tie fabric strape to fix with poles as shown in diagram 1 Securing just the netting 2 Securing netting and curtains 3 Use all ties for winding conditions There are...

Page 27: ...Copyright 2016 2019 Kozyard LLC All Rights Reserved Kozyar A Mer W 66...

Reviews: