2.5. Skills of Qualified Personnel
All installation of the inverter shall be carried out by professionals, and the following conditions
shall be met:
- Have received training on installation, commissioning and hazard management of electrical
system;
-Be familiar with the contents of this manual and other relevant documents;
- Know local regulations.
3. Energy Management
Depending on your configuration and layout, the inverters usually have the following operation
modes:
1)Self use(It is necessary to connect the Grid and save it after power failure)
2)Forced Charging(It is necessary to connect the Grid and not save it after power failure)
3)Forced Discharge(It is necessary to connect the Grid and not save it after power failure)
4)Peak Shaving
5)Maintenance
6)Emergency Charging
7)Off Grid
The user can set the inverter to the above working modes according to the actual needs. The
detailed mode settings and functions are described as follows:
3.1. Self Use
The energy generated by the photovoltaic system shall first meet its own load consumption, then
the excess energy is used to charge the battery, and finally the remaining energy can limit the
power fed into the power grid by setting and adjusting the power of the network, as shown in the
figure below:
Summary of Contents for KY-EST06KH
Page 1: ...1 User Manual 3 Phase Hybrid Inverter KY EST06KH KY EST20KH V1 0...
Page 10: ...10 Dimensions KY EST06 10KH unit mm Dimensions KY EST12 20KH unit mm...
Page 12: ...12 Fig1 5 Three phase Meter Dimension unit mm...
Page 15: ...15 Each successive press of the button selects a new parameter...
Page 16: ...16 Each successive press of the button selects a new parameter...
Page 17: ...17 Each successive press of the button selects a new parameter...
Page 32: ...32 View the power quality response mode...
Page 34: ...34 Figure 5 2 2...
Page 68: ...68...
Page 70: ...70 Figure...