Korg Nu:tekt OD-KIT Owner'S Manual Download Page 3

 - 3 -

Cautions Before Assembly

Be careful of injury when handling parts

Use caution not to injure yourself due to the protruding parts when 
handling the circuit board. Use cotton work gloves to protect your hands 
when working. Also, be sure to wash your hands thoroughly after working.

Tighten screws and nuts at a perpendicular angle

Tightening screws and nuts that are inserted diagonally may damage the 
threads, making it impossible to tighten them again. Be sure to tighten 
screws so that they are inserted perpendicular to the surface.
Use caution, as applying too much torque and tightening the screws too 
tightly may damage the parts.

Do not injure yourself or scratch the surface with the tools.

When using tools to tighten screws and nuts, make sure not to injure 
yourself, such as by getting your fingers pinched. Work carefully to avoid 
scratching the case or circuit board with the tools.
Provide a sufficiently large work space to complete the assembly procedure, 
and prepare work mats so parts will not be scratched.

Avoid losing the screws and nuts

Handle the screws and nuts with caution, to avoid losing them. Do not use 
other screws or nuts aside from the ones included with this kit, and do not 
use the screws and nuts included with this kit for any other purpose.

Tools to prepare

You will need the following tools in order to assemble this kit.

Note:  

You will also need a battery, solder, glue, adhesive tape and so on. 
These items are not included, so please obtain them separately.

• 

Soldering iron

• 

Nippers, needle-nose pliers, tweezers

• 

Phillips head screwdriver (No. 2), precision flathead screwdriver (2.4 
mm)

Use a screwdriver that matches the size of the screw. Using the wrong 
size of screwdriver may damage the screw or make it impossible to 
tighten.

• 

Spanner, wrench (two-sided, 10 mm/11 mm/14 mm wide)

• 

Tester

Checking the parts

Before assembly, make sure that all parts are on hand.
Contact us at www.nutekt.org if any parts are missing or damaged.

Caution when painting the case

Make sure not to get any paint on the areas on the case that come into 
contact with the volume controls.
The case and volume controls should conduct electricity.

Summary of Contents for Nu:tekt OD-KIT

Page 1: ...ower make sure to check for any mistakes in mounting or imperfect solder points Table of Contents Precautions 2 Cautions Before Assembly 3 Tools to prepare 3 Checking the parts 3 Parts and materials 4...

Page 2: ...tice regarding disposal EU only If this symbol is shown on the product manual battery or package you must dispose of it in the correct manner to avoid harm to human health or damage to the environment...

Page 3: ...nd prepare work mats so parts will not be scratched Avoid losing the screws and nuts Handle the screws and nuts with caution to avoid losing them Do not use other screws or nuts aside from the ones in...

Page 4: ...ultiple x10 x102 x103 x104 x105 x106 x107 x108 x109 x1 x0 1 x0 01 Precision 1 2 0 05 0 5 0 25 0 1 5 10 Reading the capacitor values When the value 103 is shown 10 x 103 10000 pF 0 01 F When the value...

Page 5: ...uded If you are concerned about whether you can assemble this kit or whether you might make a mistake refer to the video explanations available on the Web or use our assembly service support chargeabl...

Page 6: ...oard to Double will give you a two series circuit adding gain and volume 5 EFFECT ON OFF switch Switches the effector on off 6 EFFECT ON OFF LED The indicator lights when the effector is on Specificat...

Page 7: ...capacitor CL OPEN 1 OD OPEN 1 DS 0 01 F 1 12 C16 Film capacitor CL OPEN 1 OD 0 22 F 1 DS 0 0082 F 1 13 C10 C25 Ceramic capacitor 100PF B 2 14 C5 Film capacitor 0 01 F 1 15 C14 C17 C20 C21 Ceramic capa...

Page 8: ...ectors B8B ZR 3 4 2 44 CON1 DC jack PJ30KM0BB140 69B 1 45 J1 J2 Phone jack LJB0664 6 2 46 SW2 Slide switch MS 22D10 1 47 V1 Nutube vacuum tube Nutube 6P1 1 48 VR1 VR5 Volume control 10K A 2 49 VR2 Vol...

Page 9: ...9 Mounting Diagram...

Page 10: ...ocket 3 Be sure to install the part in the correct direction 5 Install the operational amplifier 2 in the socket Install the pin 1 of the operational amplifier shown with a mark so that it lines up wi...

Page 11: ...Solder the volume controls carefully so that they are flush with the circuit board without being slanted Tip It may be difficult to solder the volume controls if you have installed the phone jacks fir...

Page 12: ...the Nutube circuit board with the screen printed surface After making sure that all of the Nutube pins have been inserted into the holes on the circuit board peel off the release paper on the Nutube...

Page 13: ...d with LED holder Nuts Included with LED holder 10 Nutube bottom cushion CR sponge 48 x 22 x 7t 11 Battery sold separately 9V alkaline battery 6LF22 6LR61 12 Battery snap 13 Battery cushion 14 Foot sw...

Page 14: ...ide of the upper case Solder the longer LED lead to the red harness wire and the shorter lead to the white wire Tip If the end cap is loose and falls off use adhesive tape or glue to fix it in place 3...

Page 15: ...d the main circuit board with harness B 53 9 Connect the LED and the main circuit board with harness C 54 10 Attach the battery cushion 14 into the battery space foot switch 11 Connect the battery and...

Page 16: ...al sound when I tilted it or shook it after assembly A loose screw or other part might be left inside the unit Open the lower case and check the inside The volume controls or jacks are loose Make sure...

Reviews: