NSC2U Server—5
Kontron IP Network Server NSC2U
Product Guide, rev. 1.4
December 2009
114
4. If this is the last task you are performing, replace the top cover of the chassis.
Reconnect all the external devices and plug in the power cord(s).
For information about mounting the server in a rack, see
the Server into a Rack” on page 48
.
5.5
Replacing the Power Distribution Board
The power distribution board (PDB) routes power from the power supply to the rest of
the server system through an integral wiring harness. The PDB is covered by a metal
cage for safety, ventilation, and heat dissipation reasons. It is this whole assembly that
must be removed and replaced, not just the board.
Caution:
Before replacing any of the boards in the NSC2U Server, you must first take the server
out of service, turn off all peripheral devices connected to the system, turn off the
system by pressing the power button, and unplug the power cord(s) from the system
or wall outlet.
When handling this board, observe the normal safety and ESD precautions. (See
Appendix A, “Safety Information”
for more information.)
To safely remove the PDB, you must first remove the chassis top cover, the front panel
bezel, and the drive bay assembly, which sits in front of the PDB module in the chassis.
5.5.1
Removing the Power Distribution Board
1. Power down the server system and unplug all peripheral devices and the power
cable.
Figure 100. Installing the Drive Bay Assembly
A
B
C
TS000314