![Kongskilde Z 665 H Operator'S Manual Download Page 43](http://html1.mh-extra.com/html/kongskilde/z-665-h/z-665-h_operators-manual_1992818043.webp)
4 - OPERATING INSTRUCTIONS
4 - OPERATING INSTRUCTIONS
###_4_###
Commissioning the unit
Commissioning operation
The implement is provided on pallet with:
• The right-hand side rotor and left-hand side rotor as-
sembled.
• The support wheel assembled.
• The outer rotor raised.
• The outer guard elements bundled.
• The Power Take-Off (PTO) shaft and outer support
wheels loose.
• The hardware in a plastic bag.
The tedder is completely assembled except the frame with
warning panels and the tine arms. You can find the loose
parts and the plastic bag with hardware wired to either the
pallet or machine in a space saving way.
ZEIL18HT00732AA
1
Raise the implement on a smooth surface with a fork lifter
with long forks.
ZEIL17HT00137AA
2
4-1
Summary of Contents for Z 665 H
Page 36: ...2 SAFETY INFORMATION ZEIL18HT00912FA 1 811650220 2 Part number 1650220 2 20...
Page 40: ...2 SAFETY INFORMATION 2 24...
Page 42: ...3 CONTROLS AND INSTRUMENTS 3 2...
Page 54: ...4 OPERATING INSTRUCTIONS 4 12...
Page 75: ...7 MAINTENANCE 5 Outer rotor on both sides ZEIL18AI00169AA 5 7 13...
Page 77: ...7 MAINTENANCE Headstock 4 Pin ZEIL18AI00154AA 4 7 15...
Page 84: ...7 MAINTENANCE 7 22...
Page 86: ...8 TROUBLESHOOTING 8 2...
Page 88: ...9 SPECIFICATIONS 9 2...
Page 92: ...10 ACCESSORIES 10 4...
Page 96: ...11 FORMS AND DECLARATIONS 11 4...
Page 99: ......