378511/A
47
Dual head, single swath cable plan, Processing Unit
The Processing Unit cables include those used to connect the EM 2040C Processing Unit
to AC mains power, and to the sonar head. One Ethernet cable is used to connect the
Processing Unit to the Hydrographic Work Station.
(CD020105_100_003)
C28
C34
C29-C32
C10*
C33
C25*
C37-2*
C37-1*
C37-2*
C37-1*
C36-1*
C36-2*
C27
Console
SERIAL
1
2
ETH1
ETH1
ETH1
ETH2
ETH2
ETH2
REMOTECONTROL
PMC/XMC1
PMC/XMC2
48VDC OUT
1
2
100-250V AC
USB
USB0
SYNC
SYNC
CBMF 2
GbE Switch
CPU
CBMF 1
1PPS
1PPS
GbE1
GbE2
GbE3
GbE4
GbE5
GbE6
GbE7
GbE8
GbE0
CPU3
Port 1
Port 2
Port 4
Port 3
C26*
A
B
C
A
Processing Unit
B
Sonar Head
C
Sonar Head
Cables identified with an asterisk (*) are system cables. These are provided with the
standard EM 2040C delivery.
Related topics
Summary of Contents for EM 2040C
Page 1: ...Maintenance manual EM 2040C Multibeam echo sounder...
Page 2: ......
Page 3: ...378511 A August 2016 Kongsberg Maritime AS EM 2040C Multibeam echo sounder Maintenance manual...
Page 8: ...6 378511 A EM 2040C...
Page 16: ...14 378511 A Troubleshooting Topics BIST Built In Self Test dialog box page 15 EM 2040C...
Page 71: ...378511 A 69 Hydrographic Work Station outline dimensions Drawing 378828 2 pages Drawing file...
Page 72: ...70 378511 A Page 2 EM 2040C...
Page 124: ...2016 Kongsberg Maritime...