Operation
3.4 Transport
WA80M-7, WA100M-7 – VENAM03001
3-99
3.4
Transport
Observe all applicable laws and regulations when transporting
the machine. Be careful to ensure safety.
3.4.1
Transporting procedure
As a basic rule, always transport the machine on a trailer.
Select a trailer that is suitable for the weight and dimensions
specified in “Technical data (6-2)”.
Note that the specifications for the weights and dimensions for
transport vary according to the type of tyre and the type of bucket.
Ensure steady positioning
See “Ensure steady positioning (2-34)”.
3.4.2
Loading the machine
WARNING
When loading or unloading the machine, run the engine at low
speed. Drive and work slowly.
Park the trailer on firm and level ground for loading and
unloading the machine. Keep a sufficient distance from the
road shoulder.
Use ramps of ample width, length, thickness, and strength.
Install the ramps with an inclination of less than 15°. When
using an embankment, compact the soil thoroughly and make
sure that the slope face does not collapse.
Remove the mud stuck to the undercarriage to prevent the
machine from slipping to the side on the ramps. In addition,
remove any water, snow, ice, grease, or oil from the ramps.
Never use the steering on the ramps. There is a risk that the
machine may tip over. If it is necessary to change direction,
return to the ground surface or the trailer platform, correct the
direction, and start again.
The position of the centre of gravity of the machine will
change suddenly at the transition between the ramp and the
trailer. There is risk of the machine losing its balance. Always
drive slowly over this point.
When loading or unloading, always use ramps or a platform. Pro-
ceed as follows:
Summary of Contents for WA100M-7
Page 2: ......
Page 3: ...Foreword WA80M 7 WA100M 7 VENAM03001 1 1 1 Foreword...
Page 26: ...1 7 Equipment Foreword 1 24 WA80M 7 WA100M 7 VENAM03001...
Page 71: ...Operation WA80M 7 WA100M 7 VENAM03001 3 1 3 Operation...
Page 184: ...3 8 Reading error code Operation 3 114 WA80M 7 WA100M 7 VENAM03001...
Page 185: ...Troubleshooting WA80M 7 WA100M 7 VENAM03001 4 1 4 Troubleshooting...
Page 203: ...Maintenance WA80M 7 WA100M 7 VENAM03001 5 1 5 Maintenance...
Page 220: ...5 4 Fuel lubricants and coolants quantities Maintenance 5 18 WA80M 7 WA100M 7 VENAM03001...
Page 279: ...Technical data WA80M 7 WA100M 7 VENAM03001 6 1 6 Technical data...
Page 285: ...Special equipment attachments WA80M 7 WA100M 7 VENAM03001 7 1 7 Special equipment attachments...
Page 292: ...7 3 Central lubrication system Special equipment attachments 7 8 WA80M 7 WA100M 7 VENAM03001...
Page 293: ...Index WA80M 7 WA100M 7 VENAM03001 8 1 8 Index...
Page 298: ...8 1 Index Index 8 6 WA80M 7 WA100M 7 VENAM03001...
Page 299: ...Notes WA80M 7 WA100M 7 VENAM03001 9 1 9 Notes...
Page 300: ...Notes 9 2 WA80M 7 WA100M 7 VENAM03001...
Page 301: ...Notes WA80M 7 WA100M 7 VENAM03001 9 3...
Page 302: ...Notes 9 4 WA80M 7 WA100M 7 VENAM03001...