Operation
3.3 Operation
WA80M-7, WA100M-7 – VENAM03001
3-89
3.3.12
Adjusting the work equipment
Selecting the work equipment
See chapter “Equipment (1-22)” for approved work equipment.
Attaching the work equipment
1. Start the engine.
2. Unlock the quick coupler by setting the special equipment
control lever to position '1' while pressing and holding button
(4).
3. Slightly raise the boom by setting the multi-function lever to
position 'H'.
4. Slightly tilt the quick coupler forward. Push the multi-function
lever to position 'A' to do so.
5. Drive the machine towards the work equipment until the quick
coupler (a) is underneath the mounting hooks of the work
equipment. Then raise the boom until the work equipment is
suspended from the quick coupler.
G0010048
G0070420
4
G0010009
75_280A
a
b
Summary of Contents for WA100M-7
Page 2: ......
Page 3: ...Foreword WA80M 7 WA100M 7 VENAM03001 1 1 1 Foreword...
Page 26: ...1 7 Equipment Foreword 1 24 WA80M 7 WA100M 7 VENAM03001...
Page 71: ...Operation WA80M 7 WA100M 7 VENAM03001 3 1 3 Operation...
Page 184: ...3 8 Reading error code Operation 3 114 WA80M 7 WA100M 7 VENAM03001...
Page 185: ...Troubleshooting WA80M 7 WA100M 7 VENAM03001 4 1 4 Troubleshooting...
Page 203: ...Maintenance WA80M 7 WA100M 7 VENAM03001 5 1 5 Maintenance...
Page 220: ...5 4 Fuel lubricants and coolants quantities Maintenance 5 18 WA80M 7 WA100M 7 VENAM03001...
Page 279: ...Technical data WA80M 7 WA100M 7 VENAM03001 6 1 6 Technical data...
Page 285: ...Special equipment attachments WA80M 7 WA100M 7 VENAM03001 7 1 7 Special equipment attachments...
Page 292: ...7 3 Central lubrication system Special equipment attachments 7 8 WA80M 7 WA100M 7 VENAM03001...
Page 293: ...Index WA80M 7 WA100M 7 VENAM03001 8 1 8 Index...
Page 298: ...8 1 Index Index 8 6 WA80M 7 WA100M 7 VENAM03001...
Page 299: ...Notes WA80M 7 WA100M 7 VENAM03001 9 1 9 Notes...
Page 300: ...Notes 9 2 WA80M 7 WA100M 7 VENAM03001...
Page 301: ...Notes WA80M 7 WA100M 7 VENAM03001 9 3...
Page 302: ...Notes 9 4 WA80M 7 WA100M 7 VENAM03001...