MAINTENANCE SCHEDULE CHART
MAINTENANCE
242
MAINTENANCE SCHEDULE CHART
SERVICE ITEM
PAGE
INITIAL 250 HOURS SERVICE (only after the first 250 hours)
"REPLACE FUEL FILTER CARTRIDGE"
"CHECK ENGINE VALVE CLEARANCE, ADJUST"
"CHANGE OIL IN TRANSMISSION, HUBS + AXLES."
WHEN REQUIRED
"CHECK, CLEAN AND REPLACE AIR CLEANER ELEMENT"
"CLEAN INSIDE OF COOLING SYSTEM"
"CHECK AND TIGHTEN WHEEL NUTS"
"CHECK ELECTRICAL INTAKE AIR HEATER"
"CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID"
"CHECK AND ADJUST AIR CONDITIONER"
"DRAIN ENGINE BREATHER OIL CATCHER"
CHECK BEFORE STARTING
"CHECK COOLANT LEVEL, ADD WATER"
"CHECK OIL LEVEL IN ENGINE OIL PAN, ADD OIL"
"CHECK OIL LEVEL IN HYDRAULIC TANK, ADD OIL"
"CHECK AIR CLEANER FOR CLOGGING"
"CHECK FOR WATER AND SEDIMENT IN SEDIMENTOR. DRAIN WATER AND SEDIMENT"
EVERY 50 HOURS SERVICE
"DRAIN WATER AND SEDIMENT FROM FUEL TANK"
EVERY 100 HOURS SERVICE
Summary of Contents for PW160-7K Series
Page 2: ......
Page 3: ...3 FOREWORD ...
Page 14: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 14 ...
Page 20: ...20 ...
Page 222: ...TROUBLESHOOTING OPERATION 222 ...
Page 304: ...SERVICE PROCEDURE MAINTENANCE 304 ...
Page 305: ...305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 2 PIECE BOOM ...
Page 312: ...SPECIFICATIONS SPECIFICATIONS 312 ...
Page 354: ...ROTATING ARM OPTIONS ATTACHMENTS 354 ...
Page 357: ......