![Komatsu PW160-7H Operation & Maintenance Manual Download Page 246](http://html.mh-extra.com/html/komatsu/pw160-7h/pw160-7h_operation-and-maintenance-manual_1991290246.webp)
SERVICE PROCEDURE
MAINTENANCE
246
PW160-7H VEAM390100
SERVICE PROCEDURE
INITIAL 50 HOURS SERVICE
CHECK AND TIGHTEN WHEEL NUTS
Order for tightening
Tighten the bolts in the order shown in the diagram. Torque to
80kgm.
INITIAL 250 HOURS SERVICE
Carry out the following maintenance only after the first 250
hours.
●
REPLACE FUEL FILTER CARTRIDGE
For details, see "REPLACE FUEL FILTER CARTRIDGE
(285)"
●
CHECK ENGINE VALVE CLEARANCE, ADJUST
For details, see "CHECK ENGINE VALVE CLEARANCE,
ADJUST (246)"
For details of the method of replacing or maintaining, see
the section on EVERY 500 HOURS and 2000 HOURS SER-
VICE.
●
CHANGE OIL IN TRANSMISSION, HUBS + AXLES.
Summary of Contents for PW160-7H
Page 2: ......
Page 3: ...PW160 7H VEAM390100 3 FOREWORD ...
Page 12: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 12 PW160 7H VEAM390100 ...
Page 18: ...18 PW160 7H VEAM390100 ...
Page 220: ...TROUBLESHOOTING OPERATION 220 PW160 7H VEAM390100 ...
Page 305: ...PW160 7H VEAM390100 305 SPECIFICATIONS ...
Page 307: ...SPECIFICATIONS SPECIFICATIONS PW160 7H VEAM390100 307 1 PIECE BOOM ...
Page 308: ...SPECIFICATIONS SPECIFICATIONS 308 PW160 7H VEAM390100 2 PIECE BOOM ...
Page 345: ......