TROUBLESHOOTING
OPERATION
156
METHOD OF TOWING MACHINE
WARNING
When towing the machine, use a wire rope that has ample
strength for the weight of the machine that is being towed.
If the machine sinks in mud and cannot get out under its own
power, or if the drawbar pull of the excavator is being used to tow
a heavy object, use a wire rope as shown in the diagram.
WHEN USING THE FRONT OF CHASSIS
WHEN USING THE REAR OF THE CHASSIS
PRECAUTIONS ON PARTICULAR JOBSITES
1. When carrying out digging operations in water, if the work
equipment mounting pin goes into the water, carry out greas-
ing every time the operation is carried out.
2. For heavy-duty operations and deep digging, carry out greas-
ing of the work equipment mounting pins every time before
operation.
3. After greasing, operate the boom, arm and bucket several
times, then grease again.
Summary of Contents for PW130ES-6K
Page 11: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR 10 ...
Page 56: ...55 OPERATION ...
Page 164: ...163 MAINTENANCE ...
Page 232: ...231 SPECIFICATIONS ...
Page 234: ...SPECIFICATIONS SPECIFICATIONS 233 1 PIECE BOOM ...
Page 235: ...SPECIFICATIONS SPECIFICATIONS 234 2 PIECE BOOM ...
Page 238: ...237 OPTIONS ATTACHMENTS ...