
(5) Boom swing cylinder base pin (1 point)
(6) Pivot and thrust lever connection pin (2 points)
(7) Bucket cylinder shaft end (1 point)
(8) Bucket-articulation connection pin (2 points)
(9) Bucket thrust lever pin (1 point)
(10) Arm / bucket pivot lever pin (1 point)
(11) Bucket cylinder base pin (1 point)
(12) Boom-arm connection pins (1 point)
(13) Arm cylinder head pin (1 point)
(14) Arm cylinder base pin (2 points)
(15) Boom cylinder head pin and 2-piece boom joint (3
points)
(16) 2-piece boom cylinder head pin (1 point)
(17) 2-piece boom cylinder base pin (1 point)
3.
After greasing, wipe off any old grease that has spilled.
METHOD FOR CHANGING OIL IN ENGINE OIL PAN, REPLACING ENGINE OIL
FILTER CARTRIDGE
k
k
WARNING
Immediately after the engine is stopped, its parts and oil are still very hot, and may cause burn injury.
Consequently, wait until they have cooled down before starting the work.
Oil sump refill capacity: 11.5 ℓ
Items to be prepared
• Filter wrench
• Container to receive the oil
RKA52740
MAINTENANCE
MAINTENANCE PROCEDURE
4-45
WENAM00130
Summary of Contents for PW118MR-11
Page 2: ......
Page 9: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVEL 1 7 WENAM00130...
Page 22: ...WENAM00130...
Page 25: ...LOCATION OF SAFETY LABELS RKA64590 SAFETY SAFETY LABELS 2 3 WENAM00130...
Page 72: ...WENAM00130...
Page 74: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA61930 GENERAL VIEW OPERATION 3 2 WENAM00130...
Page 77: ...CONTROLS AND GAUGES NAMES RKA62690 OPERATION GENERAL VIEW 3 5 WENAM00130...
Page 168: ...SWITCHES RKA63060 EXPLANATION OF COMPONENTS OPERATION 3 96 WENAM00130...
Page 328: ...WENAM00130...
Page 412: ...WENAM00130...
Page 413: ...SPECIFICATIONS 5 1 WENAM00130...
Page 445: ...REPLACEMENT PARTS 7 1 WENAM00130...
Page 461: ......
Page 462: ......