DITCHING WORK
Ditching work can be performed efficiently by attaching a buck-
et which matches the ditching operation, and then setting the
wheels parallel to the line of the ditch to be excavated.
To excavate a wide ditch, first dig both sides and then finally re-
move the center portion.
SIDE DITCHING WORK
The operator can perform ditching work in a narrow space by
combining swing and boom swing operations.
LOADING WORK
In places where the swing angle is small, work efficiency can
be enhanced by locating the dump truck in a place easily visi-
ble to the operator.
Loading is easier and capacity becomes greater if you stop the
machine at the rear of the dump truck than if loading is done
from the side.
LEVELING WORK
Use the blade for back filling and leveling work after digging the
ground.
MACHINE OPERATIONS AND CONTROLS
OPERATION
3-208
WENAM00130
Summary of Contents for PW118MR-11
Page 2: ......
Page 9: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVEL 1 7 WENAM00130...
Page 22: ...WENAM00130...
Page 25: ...LOCATION OF SAFETY LABELS RKA64590 SAFETY SAFETY LABELS 2 3 WENAM00130...
Page 72: ...WENAM00130...
Page 74: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA61930 GENERAL VIEW OPERATION 3 2 WENAM00130...
Page 77: ...CONTROLS AND GAUGES NAMES RKA62690 OPERATION GENERAL VIEW 3 5 WENAM00130...
Page 168: ...SWITCHES RKA63060 EXPLANATION OF COMPONENTS OPERATION 3 96 WENAM00130...
Page 328: ...WENAM00130...
Page 412: ...WENAM00130...
Page 413: ...SPECIFICATIONS 5 1 WENAM00130...
Page 445: ...REPLACEMENT PARTS 7 1 WENAM00130...
Page 461: ......
Page 462: ......