DEFINED LIFE PARTS LIST
No.
Parts for periodic replacement
Replacement interval
1
Fuel system
Fuel hose
Spill hose
Ask your Komatsu distributor
for replacement.
2
Engine lubrication system
Engine oil filter hose
3
Work equipment hydraulic
system
Main pump delivery hose
Main pump LS hose
Swing line hose
External work equipment hoses
•
Boom foot connection hose
•
Boom cylinder hose
•
Arm connection hose
•
Arm cylinder hose
•
Bucket cylinder hose
•
Travel line hose
•
Attachment additional line hose
•
Blade cylinder hose
•
Boom swing cylinder hose
4
Others
PPC Accumulator
METHOD FOR REPLACING ACCUMULATOR (FOR CONTROL CIRCUIT)
k
k
WARNING
The accumulator is charged with high-pressure nitrogen gas, and improper operation may cause an ex-
plosion which will lead to serious injury or death. When handling, always observe the following.
• The pressure in the hydraulic circuit cannot be completely removed. When removing the hydraulic
equipment, do not stand in the direction that the oil spurts out when performing the operation. In
addition, loosen the bolts slowly when performing the work.
• Do not disassemble.
• Do not bring an open flame close to it or do not dispose of it in fire.
• Do not perform drilling, welding or flame-cutting.
• Do not hit or roll it, or subject it to any impact.
• When disposing of it, the gas must be released. Ask your Komatsu distributor to perform this work.
NOTICE
If the nitrogen gas charge pressure in the accumulator is low and operations are continued, it becomes
impossible to release the remaining pressure inside the hydraulic circuit if a failure occurs on the ma-
chine.
Replace the accumulator every 2 years or every 4000 hours, whichever comes sooner. Ask your Komatsu dis-
tributor to replace it.
MAINTENANCE
MAINTENANCE PROCEDURE
4-75
WENAM00241
Summary of Contents for PC80MR-5E0
Page 2: ......
Page 12: ...Do not repeatedly handle and lift loads VIBRATION LEVELS FOREWORD 1 10 WENAM00241...
Page 70: ...GENERAL VIEW MACHINE EQUIPMENT NAME RKA67920 GENERAL VIEW OPERATION 3 2 WENAM00241...
Page 76: ...11 Fusible link 12 Ashtray if equipped 13 Tool boxes GENERAL VIEW OPERATION 3 8 WENAM00241...
Page 343: ...SPECIFICATIONS 5 1 WENAM00241...
Page 394: ...WENAM00241...
Page 395: ...REPLACEMENT PARTS 7 1 WENAM00241...
Page 411: ......
Page 412: ......