TRANSPORTATION
OPERATION
3-182
PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE
3
WARNING
q
Never use the machine for operations with the track frame retracted.
q
Never operate the cylinders suddenly when extending or retracting the track frame gauge width. It is
dangerous if they are operated suddenly.
q
Stop the machine on firm level ground when extending or retracting the track frame gauge width.
Reducing Track Gauge
1.
Remove center frame mounting bolts (1) (front and rear: 9
each) on one side.
2.
Swing the upper structure to the side where the track frame
gauge is to be reduced, set it at 90° to track frame (2), then
use the work equipment to jack up the track frame.
3.
Set blocks (3) (20 to 30 cm wooden blocks) towards the
outside of track frame (2), then use the boom cylinder to
lower the machine slowly. The track frame (2) will slide and
stop when it contacts the stopper.
4.
Lower the machine slowly to the ground, then install 8 of
removed mounting bolts (front and rear: 4 each).
q
Tightening torque: 1520 - 1910 Nm
(155 - 195 kgm)
5.
Follow the same procedure to retract the track frame on
the other side.
Summary of Contents for PC450-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 66: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 42 ...
Page 351: ...SPECIFICATIONS 15 ...
Page 355: ...SPECIFICATIONS SPECIFICATIONS 5 5 6 7m Boom PC450 8 ...
Page 356: ...SPECIFICATIONS SPECIFICATIONS 5 6 6 7m Boom PC450LC 8 ...
Page 357: ...SPECIFICATIONS SPECIFICATIONS 5 7 6 7m Boom PC450LCHD 8 ...
Page 359: ...SPECIFICATIONS SPECIFICATIONS 5 9 7 0m Boom PC450 8 ...
Page 360: ...SPECIFICATIONS SPECIFICATIONS 5 10 7 0m Boom PC450LC 8 ...
Page 410: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS ANDD OPTIONS 6 50 ...
Page 436: ...OPERATION HIGH REACH DEMOLITION EQUIPMENT 27M 7 26 3 Extend arm cylinder Arm cylinder ...
Page 469: ...INDEX 18 ...
Page 470: ...INDEX 8 2 ...
Page 473: ...COLOPHON 18 ...