METHOD FOR REPLACING ACCUMULATOR (FOR CONTROL CIRCUIT)
k
k
WARNING
The accumulator is charged with high-pressure nitrogen gas, so improper operation may cause an ex-
plosion, which will lead to serious injury or death. When handling, always observe the following.
• The pressure in the hydraulic circuit cannot be completely removed. When removing the hydraulic
equipment, do not stand in the direction that the oil spurts out when performing the operation. In
addition, loosen the bolts slowly when performing the work.
• Do not disassemble it.
• Do not bring open flame close to it or do not dispose of it in fire.
• Do not perform drilling, welding or flame-cutting.
• Do not hit or roll it, or subject it to any impact.
• When disposing of it, the gas must be released. Ask your Komatsu distributor to have this work per-
formed.
NOTICE
If the nitrogen gas charge pressure in the accumulator is low and operations are continued, it becomes
impossible to release the remaining pressure inside the hydraulic circuit if a failure occurs on the ma-
chine.
Replace the accumulator every 2 years or every 4000 hours, whichever comes sooner. Ask your Komatsu dis-
tributor for replacement.
The accumulator is installed to the position shown in the figure.
MAINTENANCE
MAINTENANCE PROCEDURE
4-77
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......