16. Install cover (8) on the bottom of the fuel tank. (if equip-
ped)
17. After completing the replacement of filter cartridge (4),
bleed air from the fuel circuit.
REMARK
For the procedure to bleed air, see “PROCEDURES FOR
BLEEDING AIR FROM FUEL CIRCUIT (3-256)”.
METHOD FOR CHECKING SWING PINION GREASE LEVEL, ADD GREASE
Items to be prepared
Scale
1.
Swing 3 times each to the right and left, and stop the machine.
2.
Remove bolts (1) (2 pieces) on the top of the revolving
frame, and remove cover (2).
3.
Insert ruler (3) into the grease through inspection and ad-
justment hole (A). Check that the height of grease (S) in
the area where the pinion passes is at least 20 mm.
Add grease if the grease amount (S) is less than 20 mm.
4.
Check that the grease is not milky white.
Total amount of grease: 33 ℓ(29.7 kg)
If the grease is milky white, it needs to be replaced. Ask
your Komatsu distributor to replace it.
5.
Install cover (2) with bolt (1).
MAINTENANCE PROCEDURE
MAINTENANCE
4-52
Summary of Contents for PC360LC-11
Page 2: ......
Page 22: ......
Page 76: ......
Page 344: ......
Page 425: ...SPECIFICATIONS 5 1 ...
Page 429: ...PC360NLC 11 SPECIFICATIONS SPECIFICATIONS 5 5 ...
Page 430: ......
Page 450: ...PC360LC 11 2 Piece Boom PC360NLC 11 2 Piece Boom 2 PIECE BOOM ATTACHMENTS AND OPTIONS 6 20 ...
Page 457: ...ATTACHMENTS AND OPTIONS 17M LONG REACH BOOM AND ARM 6 27 ...
Page 465: ...ATTACHMENTS AND OPTIONS SUPER LONG FRONT BOOM AND ARM 6 35 ...
Page 499: ...REPLACEMENT PARTS 7 1 ...
Page 515: ......