When applying continuous impact to the same impact surface,
if the chisel does not penetrate or break the surface within one
minute, change the point of impact and carry out breaking
operations closer to the edge.
The direction of penetration of the chisel and the direction of
the breaker body will gradually move out of line with each
other, always adjust the bucket cylinder to keep them aligned.
Always keep the chisel pressed against the impact surface
properly to prevent using the impact force when there is no
resistance.
WRONG USAGE
To ensure that the machine has a long life, and to ensure that operations are carried out in safety, do not operate
the machine in any of the following ways.
q
Do not operate all cylinders to the end of their strokes. Always leave approximately 5 cm to spare.
Using the mount to gather in pieces of rock
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...