
ATTACHMENTS AND OPTIONS
ATTACHMENTS AND OPTIONS
6–40
HANDLING EXTENSION ARM
HANDLING EXTENSION ARM:PC-L850-170K00A
When an extension arm is installed, the bucket will hit the
boom cylinder foot and revolving frame when the arm is pulled
in, so be extremely careful during operations and when trans-
porting the machine.
q
When an extension arm is installed, use a narrow bucket
(width: 750 mm with side cutters, 560 mm without side cut-
ters). If the standard bucket is used, the stability is poor, and
the bucket will also hit the operator's cab when the arm is
pulled in, so do not install the standard bucket.
q
For operations on hard soil or rock, do not use the exten-
sion arm. The service life of the extension arm, boom, and
arm will be reduced.
(A) Prohibited zone to be operated
#
-5
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...