ATTACHMENTS AND OPTIONS
MACHINE READY FOR INSTALLATION OF ATTACHMENT
6–25
REMOVAL AND INSTALLATION OF ATTACHMENT
REMOVAL AND INSTALLATION OF ATTACHMENT:PC-L411-922K00A
REMOVAL
Removal:PC220-L411-520K00A
1. Lower the attachment to the ground and stop the engine.
2. Turn the starting switch to ON position (B), then set the lock
lever to FREE position (F).
3. After carrying out Step 2, operate each work equipment
control lever and attachment control pedal fully to the front,
rear, right, and left 2 to 3 times within 15 seconds to release
the internal pressure in the hydraulic circuit.
4. Set the lock lever to LOCK position (L).
5. Loosen slowly oil filler cap (F) on the top of the hydraulic
tank to release the internal pressure in the hydraulic circuit.
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...