MAINTENANCE SCHEDULE TABLE
MAINTENANCE
4–40
EVERY 100 HOURS MAINTENANCE
EVERY 100 HOURS MAINTENANCE:ALL-33A0-001A00A
LUBRICATING
LUBRICATING:PC220_KU-L410-242K01A
(When greasing is carried out by using grease pump instead of using automatic greasing system.)
NOTICE
q
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the
greasing interval.
q
Carry out greasing every 10 hours for the first 50 hours operation on a new machine.
q
After the machine is subjected to digging work in the water, be sure to grease the wet pins.
1. Set the machine to the greasing posture shown on the right,
lower the work equipment to the ground, then stop the
engine.
2. Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that is pushed out.
(1) Arm-Link connection pin (1 place)
(2) Arm and Bucket connection pin (1 place)
(3) Link connection pin (2 places)
(4) Bucket cylinder rod pin (1 place)
(5) Bucket and Link connection pin (1 place)
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...