
MAINTENANCE SCHEDULE TABLE
MAINTENANCE
4–38
2) Run the engine at low idle and swing the upper structure
90° to bring the work equipment to the side of the track.
3) Push up the machine until the track is raised slightly
from the ground. Rotate the track under no load for two
minutes. Repeat this procedure on both the right and left
sides.
When rotating the track under no load, rotate equally
both forward and in reverse.
6. Bleeding air from attachment (when installed)
If a breaker or other attachment is installed, run the engine at low idle and operate the attachment pedal repeat-
edly (approximately 10 times) until the air is completely bled from the attachment circuit.
NOTICE
q
If the method of air bleeding from the attachment is specified by the manufacturer, bleed the air
according to the specified procedure.
q
After completing the air bleeding operation, stop the engine, and leave the machine for five minutes
before starting operations. This will remove the air bubbles in the oil inside the hydraulic tank.
q
Check that there is no leakage of oil and wipe off any oil that is spilled.
q
After completing the air bleeding operation, check the oil level, and if the oil level is low, add oil.
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...