OPERATION
MACHINE OPERATIONS AND CONTROLS
3–167
REMARK
q
The smell of the exhaust gas is different from that of the conventional diesel engine because of the exhaust
gas purification function.
q
White smoke may be discharged for a short time just after the engine is started or during the KDPF regenera-
tion in the cold season, but this is not trouble.
BREAKING-IN THE NEW MACHINE
BREAK-IN THE NEW MACHINE:PC-0000-138K00A
NOTICE
Your Komatsu machine has been thoroughly adjusted and tested before shipment from the factory. How-
ever, operating the machine under full load before breaking in the machine may adversely affect the per-
formance and shorten the machine life.
Be sure to break in the machine for the initial 100 hours (as indicated on the service meter).
Make sure that you fully understand the descriptions in this manual, and pay attention to the following points when
breaking in the machine.
q
Run the engine at idle for 15 seconds after starting it. During this time, do not operate the control levers or fuel
control dial.
q
Warm up the engine for five minutes after starting it up.
q
Avoid operation with heavy loads or at high speeds.
q
Immediately after starting the engine, avoid sudden starts, sudden acceleration, unnecessary sudden stops,
and sudden changes in direction of the machine.
ENGINE WARM-UP OPERATION
ENGINE WARM-UP OPERATION:PC220_KU-0000-139K00A
NOTICE
q
Do not accelerate the engine suddenly until the warm-
up operation is completed.
q
Do not run the engine at low idling or high idling under
no load for more than 20 minutes. This will have an
adverse effect on the environment, and will also have
an adverse effect on the internal structure of the
engine. If it is necessary to run the engine at idling for
more than 20 minutes, apply a load from time to time or
run at a mid-range speed.
After the engine starts, do not start operating the machine immediately. First, carry out the following operations
and checks.
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...