EXPLANATION OF COMPONENTS
OPERATION
3–130
1. When level of urgency is low
q
If KDPF soot accumulation monitor (2) lights up yellow
(Action level monitor (3): L01), screen (A) is displayed
first.
q
The action level monitor goes out 2 seconds after and
the screen changes to standard screen (B).
q
If the lock lever is set to the LOCK position or all the
work equipment control levers are set in NEUTRAL, the
screen changes to KDPF regeneration screen (C) after
3 seconds only the first time. If the manual stationary
regeneration is not performed, the screen returns to
standard screen (B) after 30 seconds.
Then, if the accumulated soot does not decrease, the
KDPF regeneration screen (C) is displayed for 30
seconds every 2 hours.
q
If KDPF soot accumulation monitor (2) lights up yellow,
stop the machine in a safe place after finishing the work
and perform the manual stationary regeneration.
2. When level of urgency is high
q
If KDPF soot accumulation monitor (2) lights up red
(Action level monitor (3): L03), screen (D) is displayed.
q
If the lock lever is set to the LOCK position or all the
work equipment control levers are set in NEUTRAL, the
screen changes to KDPF regeneration screen (C) after
3 seconds. Then, the KDPF regeneration screen (C)
and standard screen (D) are automatically displayed
alternately according to the lever operation, until the
manual stationary regeneration is performed.
q
If KDPF soot accumulation monitor (2) lights up red,
immediately stop the machine in a safe place and per-
form the manual stationary regeneration.
REMARK
q
If the lock lever is in the LOCK position, the manual station-
ary regeneration may start automatically to protect the
KDPF.
q
If KDPF soot accumulation monitor (2) lights up red, the
maximum engine output and maximum engine speed are
limited to protect the engine and KDPF system.
Summary of Contents for PC210-10 DEMOLITION BASE SPEC.
Page 2: ......
Page 14: ...PRODUCT INFORMATION FOREWORD 1 12...
Page 75: ...OPERATION GENERAL VIEW 3 5...
Page 159: ...OPERATION EXPLANATION OF COMPONENTS 3 89...
Page 251: ...OPERATION MACHINE OPERATIONS AND CONTROLS 3 181...
Page 332: ...MAINTENANCE SCHEDULE TABLE MAINTENANCE 4 22 26 Close engine hood 1...
Page 392: ...END OF SERVICE LIFE MAINTENANCE 4 82...
Page 393: ...SPECIFICATIONS 5 1 SPECIFICATIONS SPECIFICATIONS ALL 0000 001K04A SPECIFICATIONS...
Page 397: ...SPECIFICATIONS SPECIFICATIONS 5 5 PC210 10...
Page 398: ...SPECIFICATIONS SPECIFICATIONS 5 6 PC210LC 10...
Page 444: ...RECOMMENDED ATTACHMENT OPERATIONS ATTACHMENTS AND OPTIONS 6 46...
Page 445: ...REPLACEMENT PARTS 7 1 REPLACEMENT PARTS Replacement parts ALL 0000 001K16A REPLACEMENT PARTS...
Page 453: ...8 1 INDEX...
Page 457: ...COLOPHON 18...