OPERATION
DETAILED CONTROLS AND GAUGES
3-7
DETAILED CONTROLS AND GAUGES
3
The following is an explanation of devices needed for operating the machine.
To perform suitable operations correctly and safely, it is important to completely understand methods of operating
the equipment, and the meanings of the displays.
MONITORING SYSTEM
3
X(1/2): Normal operation screen (1/2) pilot screen all
lights up
Y:
Check before starting screen
X(2/2): Normal operation screen (2/2)
Z:
Maintenance interval warning screen
A:
Basic Check items
D:
Meter display portion, pilot display portion
B:
Caution items
E:
Monitor switches portion
C:
Emergency stop items
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...