LOADING SHOVEL
OPERATIONS
7-11
EXCAVATOR WORK
7
In addition to the following, it is possible to further increase the range of applications by using various attachments.
Shovel Work
This is suitable for digging a place which is higher than the
machine's position. It is most efficient if the arm s digging angle
is from vertical to 60i forward, and the arm cylinder is used
effectively.
A simple method of seeing the angle of the bucket teeth to the
ground surface is to use the teeth and the part of the rear
bucket shown in the diagram on the right. Check that the part
of the rear bucket is more or less parallel to the teeth.
Loading Work
In places where the swing angle is small, work efficiency can
be enhanced by locating the dump truck in a place easily visi-
ble to the operator.
Loading is easier if the excavator is placed beside the dump
truck for loading. This way means more earth can be loaded
more effectively than by a loader working behind the truck.
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...