SAFETY
PRECAUTIONS FOR OPERATION
2-23
STARTING WITH BOOSTER CABLES
If any mistake is made in the method of connecting the booster
cables, it may cause the battery to explode, so always do as
follows.
q
Always wear safety goggles and rubber gloves when start-
ing the engine with booster cable.
q
When connecting a normal machine to a problem machine
with booster cables, always use a normal machine with the
same battery voltage as the problem machine.
q
When starting with a booster cable, carry out the starting
operation with two workers (one worker sitting in the opera-
tor's seat and the other working with the battery).
q
When starting from another machine, do not allow the two
machines to touch.
q
When connecting the booster cables, turn the starting
switch to the OFF position for both the normal machine and
problem machine. There is a hazard that the machine will
move when the power is connected.
q
For machines equipped with a battery isolator switch , wait
for at least 3 minutes after turning the starting switch OFF,
then turn the battery isolator switch OFF before connecting
or removing the booster cable.
q
Be sure to connect the positive (+) cable first when install-
ing the booster cables. Disconnect the negative (-) cable
(ground side) first when removing them.
q
When removing the booster cables, be careful not to let the
booster cable clips touch each other or to let the clips touch
the machine.
q
For details of the starting procedure when using booster
cables, see “Starting Engine with Booster Cables (3-244)“
in the OPERATION section.
STARTING WITH JUMP START CABLES
q
For machines equipped with a jump start cable (option), wait for at least 3 minutes after turning the starting
switch OFF, then turn the battery isolator switch OFF before connecting or removing the jump start cable.
q
For details of the starting procedure when using jump start cables, see “CONNECTED PROCEDURE OF
EXTERNAL POWER SOURCE (6-36)“.
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...