MAINTENANCE PROCEDURE
MAINTENANCE
4-52
REMARK
Air bleeding through swing operation can be achieved with fine operation of the swing hydraulic switch to the
extent that it turns on (ON lights up).
BLEEDING AIR FROM IDLER CUSHION CIRCUIT
Bleed the air from the idler cushion circuit before pumping grease into the hydraulic charge grease cylinder.
1.
Loosen plug (1) of the grease cylinder 1 turn.
(Left and right, 2 places)
2.
Open drain valve (2) on the inside of the axle fully.
(R) Machine's rear side
3.
Loosen air bleed plug (3) of the cushion cylinder approx. 1
turn.
(Left and right, 2 places)
Summary of Contents for PC2000-8 BACKHOE
Page 2: ......
Page 3: ...FOREWORD 11...
Page 27: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 9JH14979B...
Page 318: ...TROUBLES AND ACTIONS OPERATION 3 252...
Page 415: ...MAINTENANCE MAINTENANCE PROCEDURE 4 97...
Page 433: ...SPECIFICATIONS 15...
Page 436: ...SPECIFICATIONS SPECIFICATIONS 5 4...
Page 491: ...LOADING SHOVEL MAINTENANCE 7 17 q Greasing point chart...
Page 497: ...INDEX 18...
Page 498: ...INDEX 8 2...
Page 502: ...INDEX 8 6...
Page 503: ...COLOPHON 19...