![Komatsu PC16R-3 Operation & Maintenance Manual Download Page 157](http://html1.mh-extra.com/html/komatsu/pc16r-3/pc16r-3_operation-and-maintenance-manual_1991224157.webp)
USE OF THE MACHINE AND RELATED CONTROLS
155
3.3.14 CHANGING THE BUCKET
WARNING
q
When the coupling pins are removed or installed, chips may come off; always use gloves, goggles and
helmet.
q
The change of the equipment must be carried out by two operators, who must decide together the words
and signals to be used during work.
q
Avoid using your fingers to align the holes, since they may be cut off in case of sudden or uncontrolled
movements.
q
The described procedures are valid also for the coupling of the mechanical connections of the optional
equipment.
1.
Position the bucket on level ground, directing it so that the flat
part of its back rests on the ground.
2.
Remove first the tie-rod pin (1) and then the arm connection
pin (2).
3.
Change the bucket, taking care to clean the pins, the bush-
ings and the seals perfectly and to grease the pins slightly
before reinstalling them.
IMPORTANT
q
Install first the arm connection pin, making sure that the
seals are in good conditions.
4.
Put back all the safety pins (3) and lubricate by means of the
appropriate grease nipple.
1
3
2
3
RWAA0950
WEAM012405
Summary of Contents for PC16R-3
Page 2: ......
Page 24: ...22 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 25: ...SAFETY AND ACCIDENT PREVENTION 23 WEAM012405...
Page 79: ...THE MACHINE AND ITS OPERATIONS 77 WEAM012405...
Page 190: ...188 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 191: ...MAINTENANCE 189 WEAM012405...
Page 244: ...242 THIS PAGE WAS INTENTIONALLY LEFT EMPTY WEAM012405...
Page 245: ...TECHNICAL SPECIFICATIONS 243 WEAM012405...
Page 253: ...AUTHORISED OPTIONAL EQUIPMENT 251 WEAM012405...
Page 286: ...284 WEAM012405...
Page 287: ......
Page 288: ...2017 KOMATSU ITALIA MANUFACTURING S p A All Rights Reserved Printed in Europe 02 2017...