• If the machine sinks in mud and cannot get out under its
own power, or if the machine tows a heavy object, use a
wire rope as shown in the figure on the right.
• Place pieces of wood between the wire ropes and the ma-
chine to prevent damage to the ropes and the machine.
• Hold the wire rope level and set it straight to the track
frame.
• When towing a machine, travel at a speed of 1 km/h or
lower for a distance of only a few metres to a place that is
suitable for performing repairs.
Perform this only in an emergency.
PRECAUTIONS FOR SEVERE JOB CONDITION
• When performing digging operations in water, if the work equipment mounting pin goes into the water, per-
form greasing every time the operation is performed.
• For heavy-duty operations and deep digging, perform greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
OPERATION
TROUBLES AND ACTIONS
3-241
Summary of Contents for PC1250-11
Page 2: ......
Page 11: ...Do not repeatedly handle and lift loads FOREWORD VIBRATION LEVELS 1 9...
Page 24: ......
Page 66: ......
Page 377: ...Boom d Left side e Right side f Head side g Foot side MAINTENANCE MAINTENANCE PROCEDURE 4 61...
Page 378: ...Arm h Left side i Right side MAINTENANCE PROCEDURE MAINTENANCE 4 62...
Page 400: ......
Page 401: ...SPECIFICATIONS 5 1...
Page 406: ......
Page 435: ...REPLACEMENT PARTS 7 1...
Page 444: ......