FUNCTIONING
USE OF THE MACHINE AND RELATED CONTROLS
3-169
BUCKET REPLACEMENT AND INVERSION
3
WARNING
q
When the coupling pins are removed or installed, chips may come off; always use gloves, goggles and
helmet.
q
The change of the equipment must be carried out by two operators, who must decide together the
words and signals to be used during work.
q
Avoid using your fingers to align the holes, since they may be cut off in case of sudden or
uncontrolled movements.
q
The described procedures are valid also for the coupling of the mechanical connections of the
optional equipment.
1.
Position the bucket on level ground, directing it so that the
flat part of its back rests on the ground.
REMARK
Make sure the bucket is resting on the ground slightly to make
the removal of the pins easier.
When the pins are removed, check and note the number of
spacers used to adjust the clearance as this will be required in
the assembly.
2.
Remove first the tie-rod pin (1) and then the arm
connection pin (2).
3.
Change the bucket, taking care to clean the pins, the
bushings and the seals perfectly and to grease the pins
slightly before reinstalling them.
NOTICE
Install first the arm connection pin, making sure that the
seals are in good conditions.
4.
Put back all the safety pins (3) and lubricate by means of
the appropriate grease nipple.
WEAM014802
Summary of Contents for PC118MR-8
Page 1: ......
Page 2: ......
Page 3: ...FOREWORD 11 WEAM014802...
Page 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014802...
Page 27: ...SAFETY SAFETY LABELS 2 3 LOCATION OF SAFETY LABELS 2 WEAM014802...
Page 84: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014802...
Page 304: ...LUBRICATION MAINTENANCE 4 18 2 PIECE BOOM 4 Grease Filter Oil WEAM014802...
Page 379: ...SPECIFICATIONS 15 WEAM014802...
Page 390: ...LIFTING CAPACITIES TABLES SPECIFICATIONS 5 12 WEAM014802...
Page 416: ...INSTALLING AND REMOVING THE ADDITIONAL COUNTERWEIGHT OPTIONAL EQUIPMENT 6 26 WEAM014802...
Page 417: ......
Page 418: ......