
BASIC OPERATION OF MACHINE MONITOR WHEN STARTING ENGINE IN AB-
NORMAL SITUATION
• If there is any abnormality when starting the engine, the check before starting screen BB changes to the
maintenance time warning screen CC, warning screen FF, or error screen EE.
• After displaying the check before starting screen BB for 2 seconds, the screen changes to the maintenance
time warning screen CC.
• After displaying the maintenance time warning screen CC for 30 seconds, the screen returns to the stand-
ard screen AA.
• After displaying the check before starting screen BB for 2 seconds, the screen changes to the warning
screen FF-(1) or error screen EE.
• After displaying the warning screen FF-(1) for 2 seconds, the screen automatically changes to the warning
screen FF-(2).
OPERATION
EXPLANATION OF COMPONENTS
3-13
Summary of Contents for HB215LC-3
Page 2: ......
Page 24: ......
Page 27: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 3...
Page 72: ......
Page 344: ......
Page 431: ...SPECIFICATIONS 5 1...
Page 474: ......
Page 475: ...REPLACEMENT PARTS 7 1...
Page 482: ......
Page 491: ......