
7.
Pass wire ropes between the 1st and 2nd track rollers from
the front and between the 1st and 2nd track rollers from
the rear.
However, for machines equipped with full roller guards for
the track rollers, pass the wire ropes under the tracks.
When the wire rope contacts with the edge of the machine,
put wooden block or backing metal between them.
8.
Set the lifting angle (A) of the wire rope to 30 to 40 °, then
sling the machine slowly.
9.
After the machine comes off the ground, check the hook
condition and the lifting posture, and then sling the ma-
chine upward slowly.
TRANSPORTATION
OPERATION
3-252
Summary of Contents for HB215LC-3
Page 2: ......
Page 24: ......
Page 27: ...LOCATION OF SAFETY LABELS SAFETY SAFETY LABELS 2 3...
Page 72: ......
Page 344: ......
Page 431: ...SPECIFICATIONS 5 1...
Page 474: ......
Page 475: ...REPLACEMENT PARTS 7 1...
Page 482: ......
Page 491: ......