MAINTENANCE
MAINTENANCE PROCEDURE
4-41
EVERY 10 HOURS MAINTENANCE
4
LUBRICATING
4
1.
Set to the greasing posture below, lower the work equipment to the ground, then stop the engine.
2.
Using a grease pump, pump in grease through the grease fittings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed out.
(1) Boom cylinder foot pin (2 places)
(2) Boom foot pin (2 places)
(3) Boom cylinder rod end pin (2 places)
(4) Arm cylinder foot pin
(5) Arm cylinder foot pin
(6) Boom-Arm coupling pin (1 place)
(7) Bucket cylinder foot pin (1 place)
(8) Arm cylinder rod pin
(9) Arm cylinder rod pin
(10) Arm-Link coupling pin (1 place)
(11) Arm-Bucket coupling pin (1 place)
Summary of Contents for Galeo PC800LC-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 16: ...PRODUCT INFORMATION FOREWORD 1 14 ...
Page 24: ...CONTENTS 1 22 ...
Page 29: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 64: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 40 ...
Page 220: ...TROUBLES AND ACTIONS OPERATION 3 156 ...
Page 301: ...SPECIFICATIONS 15 ...
Page 304: ...SPECIFICATIONS SPECIFICATIONS 5 4 ...
Page 313: ...INDEX 17 ...
Page 314: ...INDEX 7 2 ...
Page 317: ...COLOPHON 18 ...