OPERATION
TRANSPORTATION
3-135
PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE
3
WARNING
Never use the machine for operations with the track frame retracted.
Reducing Track Gauge
1.
Remove center frame mounting bolts (1). (one side, front +
rear: 20 bolts)
2.
Swing the upper structure so that it is at 90° on the side of
track frame (A) to be retracted, then use the work equip-
ment to jack up the track frame.
3.
Set blocks (B) (20 to 30 cm wooden blocks) towards the
outside of track frame (A), then use the boom cylinder to
lower the machine slowly. The track frame (A) will slide
and stop when it contacts the stopper.
4.
Lower the machine carefully and install bolts (2). (one side,
front + rear: 8 bolts out of bolts (1))
Tightening torque: 2452 - 3040 N·m (250 - 310 kgf·m)
5.
Follow the same procedure to retract the track frame on
the other side.
Increasing Track Gauge
1.
Remove center frame mounting bolts (2) (one side, front +
rear: 8 bolts) from the front and rear of the track frame on
the side to be extended.
Summary of Contents for Galeo PC800LC-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 16: ...PRODUCT INFORMATION FOREWORD 1 14 ...
Page 24: ...CONTENTS 1 22 ...
Page 29: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 64: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 40 ...
Page 220: ...TROUBLES AND ACTIONS OPERATION 3 156 ...
Page 301: ...SPECIFICATIONS 15 ...
Page 304: ...SPECIFICATIONS SPECIFICATIONS 5 4 ...
Page 313: ...INDEX 17 ...
Page 314: ...INDEX 7 2 ...
Page 317: ...COLOPHON 18 ...