MAINTENANCE
MAINTENANCE PROCEDURE
4-33
1.
Set the work equipment in the position shown in the dia-
gram on the right, then stop the engine and set the lock
lever to the LOCK position (L).
2.
Shift O-ring (1) and measure the amount of play “a“.
Measurement is easier if you move the bucket to one side
so that all the play can be measured at one place (the left
side in the diagram).
Use a clearance gauge for easy and accurate measure-
ment.
3.
Loosen 4 plate mounting bolts (2), and loosen plate (3).
The shim is a split type, so the operation can be carried out
without removing the bolts.
4.
Remove shim (4) corresponding to the amount of play “a“
measured above.
[Example]
In the case of play of 3 mm, remove two 1.0 mm shims and
one 0.5 mm shim. Play becomes 0.5 mm. For shim (4), two
types of 1.0 mm and 0.5 mm are used.
When play “a“ is smaller than one shim, do not carry out
any maintenance.
5.
Tighten the four bolts (2).
If the bolts (2) are too stiff to tighten, pull out pin stopper
bolt (5) for easier tightening.
(6)
(7)
Arm
Bucket
Summary of Contents for Galeo PC800LC-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 16: ...PRODUCT INFORMATION FOREWORD 1 14 ...
Page 24: ...CONTENTS 1 22 ...
Page 29: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 64: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 40 ...
Page 220: ...TROUBLES AND ACTIONS OPERATION 3 156 ...
Page 301: ...SPECIFICATIONS 15 ...
Page 304: ...SPECIFICATIONS SPECIFICATIONS 5 4 ...
Page 313: ...INDEX 17 ...
Page 314: ...INDEX 7 2 ...
Page 317: ...COLOPHON 18 ...