MACHINE OPERATIONS AND CONTROLS
OPERATION
3-96
2.
Check that engine water temperature monitor (1) displays
green.
If it displays white, use the procedure in Step 3 to carry out
additional warm up of the engine until the monitor displays
green.
3.
Turn fuel control dial (2) to a point midway between low
idling (MIN) and full speed (MAX), run the engine at a mid-
range speed, and run under no load until engine water
temperature monitor (1) displays green.
If the engine water temperature monitor displays green, the engine warm-up operation is completed.
After checking that the engine water temperature monitor displays green, carry out the warming-up operation for
the hydraulic equipment.
NOTICE
Canceling automatic warm-up operation
If it becomes necessary in an emergency to cancel the automatic warm-up operation or to lower the
engine speed to low idle, do as follows.
1] Turn fuel control dial (2) to the full speed (MAX) position
and hold it for 3 seconds.
2] When fuel control dial (2) is returned to the low idle (MIN)
position, the engine speed will drop.
Summary of Contents for Galeo PC800LC-8
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 16: ...PRODUCT INFORMATION FOREWORD 1 14 ...
Page 24: ...CONTENTS 1 22 ...
Page 29: ...SAFETY SAFETY LABELS 2 5 LOCATION OF SAFETY LABELS 2 ...
Page 64: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 40 ...
Page 220: ...TROUBLES AND ACTIONS OPERATION 3 156 ...
Page 301: ...SPECIFICATIONS 15 ...
Page 304: ...SPECIFICATIONS SPECIFICATIONS 5 4 ...
Page 313: ...INDEX 17 ...
Page 314: ...INDEX 7 2 ...
Page 317: ...COLOPHON 18 ...