Slope: Face of bank, etc.
METHOD FOR OPERATING PIN PULLER
(only machine equipped with giant ripper)
1.
Stop the machine on a safe place.
2.
Lower the shank to the ground.
3.
Operate the pin puller switch to PULL position (1) and pull
out the installation pin.
4.
Move the ripper up and down, and select a desired shank
position from (C) to (E).
At this time, match the position of mark (A) at the desired
shank to the holder top (B).
(C): Large depth
(D): Medium depth
(E): Small depth
OPERATION
MACHINE OPERATIONS AND CONTROLS
3-197