INTRODUCTION
5
1.3.4 RUNNING-IN
Every machine is scrupulously adjusted and tested before delivery.
A new machine, however, must be used carefully for the first 100 hours, in order to ensure proper running-in of the
various components.
If the machine is subjected to excessive work load at the beginning of operation, its potential yield and its function-
ality will be shortly and untimely reduced.
Every new machine must be used carefully, paying special attention to the following indications:
• After the start, let the engine idle for 5 minutes, in such a way as to warm it up gradually before actual operation.
• Avoid operating the machine with the limit loads allowed or at high speed.
• Avoid abrupt starts or accelerations, useless sudden decelerations and abrupt reversals.
SYNTHETIC BIODEGRADABLE OIL TYPE HEES
On machines in which the synthetic biodegradable oil type HEES is used, the following operations are to be per-
formed besides the standard maintenance operations:
• After the first 50 hours of operation, change the hydraulic circuit drain filter.
• After the first 500 hours of operation, change the hydraulic circuit oil.
IMPORTANT
• When changing the oil filters (cartridges), check their inner part to make sure that there are no deposits.
If considerable deposits are observed, find out what may have caused them before starting the machine.
• The number of operating hours is indicated by the hour meter.
1.3.5 DIRECTIONS OF MACHINE
In this manual, the terms front, rear, left, and right refer to the travel direction as seen from the operator's seat
when the operator's seat is facing the front and the sprocket is at the rear of the machine.
Front
Operator's seat
Sprocket
Left
Right
Rear
RYA00050
Summary of Contents for 15001
Page 2: ......
Page 18: ...16 PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ...SAFETY AND ACCIDENT PREVENTION 17 ...
Page 54: ...52 PAGE INTENTIONALLY LEFT BLANK ...
Page 55: ...THE MACHINE AND ITS OPERATIONS 53 ...
Page 156: ...154 PAGE INTENTIONALLY LEFT BLANK ...
Page 157: ...MAINTENANCE 155 ...
Page 207: ...TECHNICAL SPECIFICATIONS 205 ...
Page 216: ...LIFTING CAPACITIES 214 PAGE INTENTIONALLY LEFT BLANK ...
Page 217: ...AUTHORISED OPTIONAL EQUIPMENT 215 ...
Page 232: ...230 PAGE INTENTIONALLY LEFT BLANK ...
Page 233: ......
Page 234: ... 2005 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...