3. Construct the Stud Framing
NOTICE:
Provide unrestricted service access to the pump, in-line heater and control box. You must
construct an access panel to provide sufficient clearance for servicing the pump, in-line heater, and control
box.
Construct stud framing designed for your particular installation.
Frame the floor, or construct a frame for a raised installation in accordance with the roughing-in
information. When constructing the framing, allow for the thickness of sub and finished deck materials.
Framing should be of 2x4 construction.
Do not support the unit by the rim.
When planning the stud framing, take into account the required 2
″
(5.1cm) air gap between the end of the
fill spout and the top of the bathing well rim. Take into account the thickness of your planned finished
deck material, and construct the framing and deck material with this minimum air gap in mind.
4. Install the Rough Plumbing
IMPORTANT!
Choose a fill spout which will provide a minimum 2
″
(5.1cm) air gap above the basin rim
of the unit. In addition, if you plan to install a deck-mounted, hand-held shower, the diverter vacuum
breaker must maintain a minimum 1
″
(2.5cm) air gap above the outer rim of the unit.
NOTE:
The listed Kohler spouts are designed to work with this bath at the listed location. There may be
additional spouts that are not listed.
At the locations marked 9–1/2” (24.1cm), the Stillness™ Floor Mount Bath Filler Spout (K-8358), and the
Stillness™ Laminar Ceiling/Wall Mount Faucet (K-923) are appropriate choices.
At the locations marked 7” (17.8cm) and 6–1/2” (16.5cm) the previously listed models apply along with
the Stillness™ Deck-Mount High Flow Bath Faucet (K-954–4), the Finial Deck-Mount High Flow Bath
Faucet (K-T314), the Alterna™ Deck-Mount High Flow Bath Faucet, and the Kallista Barbara Barry
(P22603).
Position the plumbing. Position the fill spout supply so the spout will reach beyond both the outer rim
and the bathing well rim. Water from the fill spout must be directed into the bathing well to fill the
unit.
The fill spout must reach beyond the inner edge of the overflow channel.
Cap the supplies, and check for leaks.
5. Prepare the Unit
Carefully lift the unit out of the carton.
Install the drain according to the drain manufacturer’s instructions. Do not connect the trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath. Be careful not to scratch the
surface of the product.
Deck
9-1/2"
6-1/2"
(24.1cm)
7"
(17.8cm)
(16.5cm)